Project EXI

The building of a Marlin 5EXi kit car, using a Seat Leon 1.8T 20v Donor
Main > Archives > 2010 > 10 >
< 00:00:00 >

Oct 24 2010

Handbrake / Rear Tunnel

070-Handbrake/IMG_5775.jpg

Sprayed the handbrake mount and attached the cables to keep them clear of the handbrake mechanism.
To fit the tunnels I had to make some adjustments to allow the gear linkage cable to exit the tunnel halfway along.
To do this I cut the tunnel in half, and cut out a slot to allow the gear linkage to exit.
Each half of the tunnel can then be fitted around the gear linkage.
Set about tidying up some wiring ready for sealing with cable loom tape.


Posted by Steve | Permanent link